Hulings Net

  • ECG 100th Photo collection

House rework, 3rd floor

Posted by marcus on August 14, 2017
Posted in: Uncategorized.

This is the top floor of the house and contains the master bedroom suite (bedroom, bath, walk in closet), 2 front bedrooms, hallway and hallway bath.

Before:

After:

Posts navigation

← House rework, main floor
New Condo →
  • Recent Posts

    • New Apartment
    • Star Wars Movie Prop Replicas
    • Visit to Arlington National Cemetery
    • Final Pics of Condo
    • Memorial Day Weekend 2023
  • Archives

    • December 2024
    • August 2024
    • July 2023
    • June 2023
    • May 2023
    • March 2018
    • August 2017
    • May 2017
    • June 2015
  • Categories

    • Move Prep
    • Uncategorized
Proudly powered by WordPress Theme: Parament by Automattic.